Side Project Launch Checklist
Pre: Validate (10 convos), MVP, stack, repo.
Build: Feature, auth, page, analytics, test.
Launch: Deploy, PH, Twitter, Reddit, HN, email, LinkedIn.
Post: Fix, retro, v2 roadmap.
Revenue: https://earnapp.com/i/mcYi92Ja
Disclosure: Some links are affiliate links.












![The CloudFlare Durable Object that would not die [How a 60-second retry loop ate every Cloudflare KV quota I had (and why it wasn't a hack)]](https://media2.dev.to/dynamic/image/width=1000,height=420,fit=cover,gravity=auto,format=auto/https%3A%2F%2Fdev-to-uploads.s3.us-east-2.amazonaws.com%2Fuploads%2Farticles%2Fai549l8zddw5az7njd7y.png)
